Code Number: TPHV02P04_07B Title: Adjustable Blade Turbines, Rocky Reach Dam, Chelan - Douglas counties, Washington
Notes: Dam: Rocky Reach Dam. Columbia River. River Mile 473.7
Hydroelectric Power, Potable Water, Structure, Generating, Generation, Electricity, Technology, Energy Production, Electrical, Industrial, Industry, Alternative, Renewable Resource, Cleantech, StructureConstruction began 1956 (Phase One) 1969 (Phase Two) Construction cost $273.1 million Creates: Lake Entiat Owner: Chelan County PUD No. 1 Turbines: 11 Spillway: 12 gates Installed capacity: 1299.6 MWNormal Full Pool: 707.0 feet Normal Low Pool: 703.0 feet Powerhouse Capacity: Nameplate capacity 1: 7 @ 117 MW, 4 @ 132 MW, 1347 MW total Peak capacity 1: 1287 MW total Hydraulic capacity: 220 kcfs A state-of-the-art juvenile fish bypass was built across the dam in 2003. |
||
|