Code Number: ICCV09P04_06 Title: Al Zampa Memorial Bridge, Carquinez Bridge
Notes: Stats for the new Suspension Bridge:
Construction CranesStructural Steel 12,722,000 Kg (14,000 T) Cable Steel 4,600,000 Kg (5,060 T) Structural Concrete 26,580 M3 (31,770 CY) Reinforcing Steel 4,662,000 Kg (5,130 T) 3 M Concrete Piling 996 M (3,300 ft) 2.700 M Rock Socket 741 M (2,400 ft) Anchorage Piles 380 Ea Anchorage Piles 12,565 M (41,200 ft) Owner: California DOT (Caltrans) Design: Caltrans Engineering Service Ctr. De Leuw - OPAC - Steinman JV Contractor: FCI / Cleveland Bridge Commercial Construction, Construction Site, Industry, Industrial |
||
|